10 Years of MGT: Our Milestones
Check out our MineGeoTech milestone timeline: Follow MineGeoTech on LinkedIn >
Check out our MineGeoTech milestone timeline: Follow MineGeoTech on LinkedIn >
Colin Thomson Geotechnical Engineer Colin graduated from the Western Australian School of Mines in 2011 with an honours degree in Mining Engineering. He has more than 8 years of experience in the mining industry having worked a range of roles from exploration and drilling to engineering in Australia, Canada, Mexico and Papua New
That’s a wrap of the AusIMM Underground Conference 2021! Check out our photos from the three-day conference and posts on LinkedIn:
Emma Jones Principal Geotechnical Engineer Emma has more than 15 years of experience in geotechnical engineering. Her specialties include: Rock mass response to excavation assessments, including rockfall investigations and response plans Ground support scheme design, including cost analysis and optimisation Seismic system design, monitoring and analysis Numerical modelling Open-pit & underground feasibility studies
Austmine’s METS Tech Talk explores new innovations and processes in mine planning and design John has more than 25 years of experience in mining and geotechnical engineering. His specialties include: Dynamic testing and analysis of rock reinforcement and support systems, resulting in a vast knowledge of reinforcement response to dynamic energy and using this knowledge
Dr. John Player Founder, Director and Principal Engineer John, MineGeoTech founder and principal engineer, has more than 25 years of experience in mining and geotechnical engineering. His specialties include: Dynamic testing and analysis of rock reinforcement and support systems, resulting in a vast knowledge of reinforcement response to dynamic energy and using this knowledge
New Look - Same Team Some more observant souls may have noticed a regular beat of change drumming through the very core of MineGeoTech over the past 18 months. Some smaller changes and some whopping great changes. Over the past 18 months, MineGeoTech has embarked on a planned phase of continuous growth and improvement, diversifying