July 18, 2022
The MineGeoTech team have shown that early geotechnical involvement can provide confidence in subsequent stages of a mining project. Especially where an initial analysis has indicated difficult geotechnical conditions. This includes conducting slope design risk assessments.
And the benefits of early intervention don’t just stop there. MineGeoTech Director and Principal Engineer Dr John Player explained it’s also in the early stages of project definition that there is the most opportunity to maximise the value of the mine’s deposit, mainly through investigations into optimal mining methods.
Explore the positive impact of early geotechnical involvement and slope design risk assessments.:
The MGT Way is engineering advice
grounded in rigorous data analysis, enabling robust design.
Contact Us >
Our Services >
Meet the Team >
Explore Our Projects >